Customization: | Available |
---|---|
After-sales Service: | Twenty Four Online |
Warranty: | a Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ZTIC is the largest casting & forging center in central-south China.
Casting equipment includes:
80t, 50t & 40t electric arc furnaces 2 x 150t & 60t LF ladle refining furnaces 150t & 60t VD/VOD refining furnaces R-H vacuum circulating degassing unit for liquid steel |
Carbon steel Structural alloy steel Structural steel Refractory steel Stainless steel (special purpose) |
Carbon Steel |
600t |
Grey Iron | 30t |
Spheroidal Graphite Iron | 20t |
Non ferrous | 2.5t |
Carbon steel, alloy steel, high temperature alloy Non-ferrous alloys such as copper alloy, aluminum alloy and titanium alloy. |
Large Gear Reducers |
Large reducers are widely used in mining, building material, metallurgical, power & petroleum and the chemical industries, etc. Of these, the reducers for mine hoist occupy 85% of the Chinese market, and the reducers for building material and sugar press have more than 40% and 50% of the market respectively. Large open gear with a diameter of 11.72m is the largest in China. |
Large Casting & Forgings |
The production of the largest castings by the company such as: |
Racks Gears Tyres Supporting Rollers End Cover Propeller Brackets for ships Horns Large Bearing Rings |
Large Forgings |
High-Power Turbine Generator Rotor Large Hoist Shaft Rollers Forgings for ships Pressure Container |
They are all dominant in the local market and have been sold overseas. |
No. | process | processing measure |
processing equipment |
program of tests | inspection equipment |
1 |
prepare |
1. Material: high quality cast steel 2. Formulate reasonable casting process and ensure casting quality by means of computer simulation of solidification 3. Formulate reasonable smelting process to ensure the chemical composition of casting 4. Formulate reasonable heat treatment process to ensure Verify the mechanical properties of the casting |
|||
2 |
modelling |
1. Strictly control the quality of type (core) sand, ensure the strength and control of water 2. Sand tamping, inclined surface polishing, paint brush twice 3. Place the pouring riser and cold iron according to the process requirements 4. Clean and bake as required cavity |
sand mixer |
Check the quality of type (core) sand and surface sand 2. Check the cavity size Check the baking time |
|
3 |
Smelting casting |
1. Choose low S.P pig iron, select scrap steel, auxiliary materials and alloy of baking furnace according to process 2. According to special process smelting, make steel S.P hazardous elements meet internal control standards 3. The finished molten steel is treated with argon blowing in the ladle and R-H vacuum circulation degassing to make the molten steel composition uniform, harmful oxygen (H, O) reduction, uniform temperature, increase the fluidity of molten steel, so as to ensure good liquid replenishing of the casting and prevent the casting from porosity and other defects Strictly control casting temperature and casting speed according to the provisions |
50 t furnace R-h vacuum circulation degassing equipment for ladle argon blowing device |
1. Furnace materials must meet the technological requirements 2. Control feeding temperature, feeding quantity, pure boiling time, steel temperature 3. The direct reading spectrometer is used to quickly detect the chemical composition in front of the furnace to ensure that the equipment is in the best state during melting and the chemical composition of the finished product meets the requirements during pouring 4. Check the parameters of argon blowing and R-H vacuum treatment 5. Check the starting temperature and Pouring time |
Direct reading spectrometer The physical and chemical equipment |
4 |
Cleaning and heat treatment |
1. The internal heat preservation time of casting mold shall not be less than the process requirements 2. Sand falling, shot blasting, cutting and pouring risers meet the technological requirements 3. Strictly carry out the blank heat treatment To ensure the uniformity of furnace temperature and refine the original structure of casting |
50t Inert falling sand machine and 8.5 ×12m Heat treatment furnace |
1. Check the furnace temperature record 2. The sample is heat-treated with the casting in the same furnace, and the mechanical properties are sent to be checked immediately 3. Check the surface quality of the blank Quantity, geometric dimension and machining allowance |
The physical and chemical equipment |
5 |
rough machining | 1. Reserve allowance for rough machining according to technological provisions Artificial aging treatment |
Vertical lathe 8.5 ×12m Heat treatment furnace |
Check the size Visual inspection for defects ultrasonic inspection |
Ultrasonic Testing |
LUOYANG ZHONGTAI INDUSTRIES able to provide:
1. ENGINEERED SPARES - DESIGN AND MANUFACTURING
2. LARGE VOLUME STEEL AND IRON CASTING FOUNDARIES
3. HUGE MACHINE SHOP CAPABILITIES
4. TRAINING PROGRAMMES
5. PREVENTATIVE MAINTENANCE PROGRAMS
6. PREVETATIVE MAINTENANCE SERVICES
7. COMPREHENSIVE MAINTENANCE PROGRAMS
LUOYANG ZHONGTAI INDUSTRIES's Field Service Engineers are trained specifically in the LUOYANG ZHONGTAI INDUSTRIES brand group products but are capable of undertaking the servicing of other OEM brands.
Our technicians are equipped with the most advanced technological diagnostic equipment available to trouble shoot your equipment to optimise performance and minimise down time.
LUOYANG ZHONGTAI INDUSTRIES also has an extensive capability in supplying all you consumable and electrical/ mechanical spare part needs.
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time:
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms
A: Accept payment type: T/T, L/C, Western union,Cash.
30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: We can supply technical guide for machines running test and parts maintenance if end user needs.