Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description of Vertical kiln production line for ZTIC
We can supply complete machinery requirements for 6000-10000 t/d production lines and can accept turnkey projects for 5000 t/d cement plants. We have cooperated with, and exchange technologies with, world leading companies such as F.L.Smith in Denmark, Leosche in Germany and others. We have a good reputation in making large Rotary Kilns, large Ball Mills and large Roller Presses used in the Building Material Equipment Industry.
We also have registered "Chinese Brand" names for our key equipment.
Our market share in this industry is over 65%. The cement grinding plant mainly used in crushing and preheating of raw materials, and grinding and packaging of cement. And it is mainly applied to deal with industrial solid wastes like slag, coal ash, coal gangues, and so on. Therefore, it contributes great to the environment protection industry. Our cement grinding plant has the features of simple technological process, easy operation, low investment, electricity saving, environmental friendliness, etc. And various admixtures can also be used in this plant. Here in ZTIC, one-stop service is available, including engineering design, construction, related equipment, assembly and debugging, technical service, and general contracting service. Besides, we have successfully finished many relevant engineering projects, like the construction of cement grinding plant with an annual output of 1-1.2 million tons, the building of cement grinding plant with 0.5-0.6 million tons' annual output, the construction of 0.2-0.3 million tons' annual output cement plant, and the building of plant with 0.1 million tons' annual output. 1,000,000Tons/Year Cement Grinding Plant: This plant features are high quality, high productivity and low consumption. |
Process Flow Design of 1,000,000Tons/Year Cement Grinding Plant:
1. Designing of Clinker Grinding Production Line
After gypsum, clinker and limestone are measured by the belt weigher, they will be mixed together in accordance with particular proportions, and then sent to the stable weighing warehouse. During this process, magnetic metals are removed by the iron remover from these materials. Then mixed materials will be sent into the rolling machine to be crushed. After crushed, they will be sent to the powder separator, in which coarse powder will be sent back to the griding mill while the fine one will be sent to the elevator for finished products. Finally, they will be sent to finished product storage. Meanwhile, dusty gas from the grinding mill will be purified by the environmental protection equipment before discharged into the atmosphere.
2. Design of Slag Grinding Production Line
Gypsum, dry slag and pulverized coal are measured by the belt weigher before mixed together according to particular proportions. Mixed materials will be sent to the mill for grinding, and during this process, iron remover is employed to remove magnetic metals in these materials. After grinded, fine powder will be sent to high-efficeint powder separator, while coarse powder will be sent back to the grinding mill. Finished cement will be collected by the air tank pulse bag filter, while the fine powder will be sent to the storage for finished products through an elevator. Dusty gases from the mill will be used as the first gas to enter into the powder concentrator, which is followed by fresh air. Finally, dusty gas will be purified by the air tank pulse bag filter before discharged into the atmosphere.
3. Design of Mixing Fine Slag and Powder Clinker
Besides the fineness of powder clinker and fine slag in the grinding production line, accurate measuring and even mixing also need to be paid much attention to. That's why we choose to use the screw measurer as the measuring device and the air slide as mixing device as well as conveying device.
As a professional manufacturer and supplier of cement grinding plant in China,CITIC HIC Co., Ltd can also provide you with various other machines, such as rotary kiln, lime rotary kiln, industrial kiln and furnace, grinding equipment, crushing equipment, environmental protection equipment, cooling equipment, drying equipment, compound fertilizer equipment, packing machine, chemical equipment and electrical control system. Most of our products have passed the certification of ISO9000 and CE, and they have been quite popular among customers from as many as 60 countries and districts such as Germany, Russia, Brazil, Egypt, Iran, Japan, South Korea, Bengal, Pakistan, Turkey, Burma, Vietnam, South Africa, Columbia, Bolivia, etc. If you need cement grinding plant, please don't hesitate to contact us.
LUOYANG ZHONGTAI INDUSTRIES able to provide:
1. ENGINEERED SPARES - DESIGN AND MANUFACTURING
2. LARGE VOLUME STEEL AND IRON CASTING FOUNDARIES
3. HUGE MACHINE SHOP CAPABILITIES
4. TRAINING PROGRAMMES
5. PREVENTATIVE MAINTENANCE PROGRAMS
6. PREVETATIVE MAINTENANCE SERVICES
7. COMPREHENSIVE MAINTENANCE PROGRAMS
LUOYANG ZHONGTAI INDUSTRIES's Field Service Engineers are trained specifically in the LUOYANG ZHONGTAI INDUSTRIES brand group products but are capable of undertaking the servicing of other OEM brands.
Our technicians are equipped with the most advanced technological diagnostic equipment available to trouble shoot your equipment to optimise performance and minimise down time.
LUOYANG ZHONGTAI INDUSTRIES also has an extensive capability in supplying all you consumable and electrical/ mechanical spare part needs.
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time:
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms:
A: Accept payment type: T/T, L/C, Western union,Cash.
30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: We can supply technical guide for machines running test and parts maintenance if end user needs.