Environment-Friendly 2500t/D Dry Process Cement Ball Mill

Product Details
Customization: Available
After-sales Service: Online Service
Warranty: 1 Year
Gold Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2014-02-10
  • Environment-Friendly 2500t/D Dry Process Cement Ball Mill
  • Environment-Friendly 2500t/D Dry Process Cement Ball Mill
  • Environment-Friendly 2500t/D Dry Process Cement Ball Mill
  • Environment-Friendly 2500t/D Dry Process Cement Ball Mill
  • Environment-Friendly 2500t/D Dry Process Cement Ball Mill
  • Environment-Friendly 2500t/D Dry Process Cement Ball Mill
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Company Profile
  • Our Advantages
  • Certifications
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
Cement Plant
Application
Construction
Certification
ISO
Customized
Customized
Automatic Grade
Semiautomatic
Type
Ball Mill
Motor Type
AC Motor
Rotationl Speed
20-22r/Min
Motor Power
380-4200 Kw
Materials
Cement Ball Mill
Model (M)
2.2X6.5-4.6X14 M
Medium Load T
31-285 T
Capacity
13-110tph
Weight (T)
53-310 T
Transport Package
Simple Packing
Specification
Cement Ball Mill
Trademark
ZTIC
Origin
Luoyang, Henan
Production Capacity
1000PCS/Year

Product Description

Environment-Friendly 2500t/D Dry Process Cement Ball Mill
Product Description

Process Flow of 2500Tons/Day Dry Process Cement Plant: 
The main process flow of this 2500t/d dry process cement plant is as follows:
1. Crushing, Conveying and Storing of Limestone. 
First, limestone is crushed by the MB56/75 crusher. When the maximum feeding size is not more than 1500mm and the discharging size is not more than 75mm, the crushing capacity of this machine is 500 to 600t/h.
Second, the crushed limestone will be transported by belt conveyor to the Φ80m round prehomogenization yard whose storage capacity is 34100t.
Third, the crushed limestone will be prehomogenized and then stored in this yard. Additionally, the stacking capacity of our stacker is 800t/h, and the reclaiming capacity of reclaimer is 500t/h.
Finally, the prehomogenized limestone will be sent to the batching station for raw materials.

2. Storing, Crushing and Conveying of Auxiliary Raw Materials. 
The open storage yard for sandstones has a specification of 60 m×20m, and a storage capacity of 5100t. And the open storage yard for iron ores has a specification of 32 m×20m, and a storage capacity of 2730 t.

PC1609 hammer crusher is used to crush both sandstones and iron ores. When the feeding size is not more than 600mm, and discharging size less than 25mm, its crushing capacity is 50 to 70t/h.

The crushed sandstones and iron ores will be sent by the belt conveyor to batching warehouse for storage.

The pulverized coal will be stored in the batching warehouse for storage through the self-discharging system.

3. Batching Station for Raw Materials. 
In the batching station, there are four batching warehouses respectively for limestone, sandstones, iron ores, and pulverized coal, and their specifications are φ12 m×25m, and storage capacity are 2200t,1600t, 2200t, and 770t respectively. Inside these warehouses, there are weighing feeders used to measure materials to be given.

4. Grinding of Raw Materials and Waste Gases Treating. 
MLS3626 vertical mill is used to grind raw materials, and waste gases from preheater are applied in drying. The whole production capacity is 185t/h.

Grinded raw meal is separated by the fine powder separator, and then mixed with powder in the conditioning tower and electric environmental protection equipment. Finally it will be sent to the homogenizing warehouse for homogenization as well as storage.

Waste gases from the mill will take purification treatment in the electric environmental protection equipment before discharged into the air.

5. Homogenizing of Raw Meal. 
Our CP homogenizing silo has a specification of Φ18m×50m, and its effective storage capacity is 9000t.

6. Calcining and Storing of Clinker. 
The specification of our RF5/2500 decomposition furnace isΦ4.0×60m, and our round 2-φ18×40m warehouse has an effective storage capacity of 2-10000t. Additionally, the final discharging gas has a dust content less than 100mg/m3 if in standard conditions.

7. Storing and Conveying of Raw Coal and Pulverized Coal. 
Raw coal will be stored and prehomogenized in a crane room with a specification of 21m×113m and a storage capacity of 9300t. There are two raw coal silos in the crane room, and weighing feeder can also be found in that room. A MPF1713 coal grinder is used to grind coal. When the moisture of feeding materials is no more than 10%, the moisture of pulverized coal is no more than 1%, and the particle size of raw meal is no more than 50mm, the output of the whole system is 20t/h.

The pulverized coal will be sent to two silos for storage, and the purified waste gas is discharged into the atmosphere. There is also measuring system in these two silos.

8. Drying and Conveying of Slag and Crushing and Conveying of Gypsum. 
The drying capacity of ourφ2.4×18.350m dryer is more than 30t/h, and the open storage area has a storage capacity of 4000t. When the feeding size is no more than 600mm and the discharging size is no more than 25mm, the productivity of our PFC-1609 impact hammer crusher is 50 to 70t/h.

9. Grinding, Conveying and Storing of Cement. 
In the cement batching station, there are four batching rooms respectively for clinker, gypsum, limestone and slag. And the clinker one has a specification of φ10 m×22m and a storage capacity of 2000t. The specification of batching rooms of gypsum, slag and limestone is φ8 m×22m, and their storage capacity is 800t, 400t and 900t respectively. The packaging capacity of packing machine is 90t/h.

Environment-Friendly 2500t/D Dry Process Cement Ball Mill
Cement Ball mill is mainly used to grind the clinker and raw materials in cement industry and also can be applied in metallurgy, chemical, electric power and other industries to grind all kinds of ores.  Cement ball mill is not only suitable for over-flow grinding, but also applicable for cyclic close-flow grinding together with powder collector.
Cement ball mill  is an efficient tool for fine powder grinding. The  Cement ball mill is used to grind many kinds of mine and other materials, or to select the mine.  Cement ball mill is widely used in building material, chemical industry, etc. There are two ways of grinding: the dry way and the wet way. It can be divided into tabular type and flowing type according to different expelling mine.
ZTIC Cement ball mill Feature:
1.The cylindrical mill adopts the driving type edge-driving, center-driving, edge-driving with multi-point meshing, etc; driven by asynchronous motor +reducer +pinion and gear as well as synchronous motor +
air l\clutch + pinion and gear.
2.Generally supported by static-dynamic pressure bearing on both ends. Fuuly closed self-aligning 120º osculation rocker bearing is used. Also single or double slipper staic- dynamic bearings can be used. The bush is made by NC machine.
3 .The large open gear is designed using AGMA standard, Equipped with reliably sealed gear housing and grease ahtomatic spraying lubrication system.
 The shell is key part of a mill. Carry out finite element analysis on it with computer to ensure the reliable operation;
4 .The shell is automatically welded, ultrasonic inspected, wholly annealed and machined by large special machine tools on one chucking; there special seal on static-dynamic connection parts , ch as feed and discharge hoper, trunnion, etc, to prevent oil and slurry leakage;
5 .The liner is of wear-resistance material mad by our company, wich has been specially heat-treated, with high hardness and long service life. Also other wear-resistance casting or rubber liner can be used;
6. There are slow speed drive for medium and large mill;
7.The high and low pressure lubricating station is equipped for medium and large mill;
8.The control and protection system is controlled by PLC. technical advantages
1. High capacity and Low consumption: the capacity of SCM series super-micro mill, compared with that of jet mill and mixing mill, has been improved by 40% under the same final fineness and electric power.
2. High fineness and Flexible adjustment: the final fineness can be adjusted from 325 meshes to 2500 meshes according to the requirements, and the fineness can reach D97≤5um.
3. Trustworthy security: there is no rolling bearing and bolt in the mill chamber, therefore, the bearing and sealing elements will not wear out easily, and the bolts will not loose to make damage to the equipment.
4. Clean and environment-friendly: equipped with the pulse filter and sound absorber, the mill reaches the environment-friendly standard of our country and reduces the dust and noise greatly.
Cement Ball mill working principle
Cement Ball mill Main feature and working principle 
2.1 Cement Ball mill Main feature  
 This mill is center driven, which adopts slipper bearing support, new type combination design baffle plates and discharge grate, to raise crushing, grinding and screening efficiency. 2.2
Working principle  
  The material is fed into the rough grinding bin through the feeding device; then crushed under the impact and grinding of grinding agent (steel ball with longer diameter), and the finer material enter into the fine grinding bin through double layered baffle plates and other material which can not enter into the fine grinding bin will continue be crushed in the rough grinding bin; the material which enter into fine grinding bin will entail further impact and grinding of smaller grinding agent, and the finished goods which meet the degree of fineness will enter into discharging device and been discharged from the mill.   
Installation and maintenance of ball mill

The maintenance of the machine is an extremely important regular work, it should be closely coordinated with the operation and maintenance of the machine, there should be full-time personnel on duty inspection.
I. Machine maintenance
1, the mill should be full-time inspection workers shift inspection, maintenance;
2. Pay close attention to the temperature of the main bearing bush, which shall not exceed 60C;
3. Always check the main bearing reducer, the lubrication of the motor and whether the oil supply is sufficient, and pay attention to the supplement of lubricating oil.When refueling or changing oil in winter, the oil should be heated to about 20C in advance, and the spoiled and unclean lubricating oil is not allowed to be used.

Structure introduction 
Product Parameters

The mill mainly consists of feeding device, slipper bearing, rotating part, discharging device, lubricating device of slipper bearing.  3.1 Feeding device 

Cement Ball Mill  | Technical parameters
NO Model (m) Production capacity    t/h Speed r/min Feed  in size
 mm
medium load   t Effective volume Main motor Size Weight  (T)
Power  kw Voltage  V L W H
1 Φ2.2×6.5 13-14 22 <25 31 21.4 380 6000 12385 5390 4210 53
2 Φ2.2×11 15-16 21 <25 50 36 630 6000 21559 4540 3520 109
3 Φ2.2×13 16-18 21.5 <25 60 43 630 6000 26079 4540 3520 114.2
4 Φ2.4×8 15 20.8 <25 45 30 560 6000 17215 5564 4540 82.53
5 Φ2.4×13 20-23 19 <25 65 51.7 800 6000 27580 4540 3620 138
6 Φ2.6×13 30-32 19.6 <25 80 60 1000 6000 20883 7740 5670 144.5
7 Φ3×9 28-32 17.8 <25 70-80 55 1000 6000 23568 4760 3670 138.7
8 Φ3×11 36-40 18.9 <25 100 69 1250 6000 27610 5720 4080 181.9
9 Φ3×11 36 17.69 <25 100 69 1250 6000 24567 7510 5968 156.5
10 Φ3.2×11 40-45 17.4 <15 90-100 78 1250 6000 28000 5720 3672 180
11 Φ3.5×9.5 40 18 <20 115 76.4 1400 6000 29717 5250 5000 194.4
12 Φ3.5×11 45 17.2 <15 116 78.5 1600 6000 28454 5350 5600 271.64
13 Φ3.6×8.5 60 16.5 <20 102 86 2500 6000 19693 4141 5404.5 233.3*
14 Φ3.8×9 70-80 16.5 <20 130 94 2000 6000 28521 5550 5600 255.2
15 Φ3.8×12.5 55 16.4 <25 167 123.5 2500 6000 17419 10745 8204 301.4
16 Φ3.8×13 60 16.3 <25 173 128 2500 6000 19693* 4141* 5404.5 223.3*
17 Φ4.2×11 120 15.75 ≤3 80%pass 182 134.5 2800   18500 4400 6500 256**
18 Φ4.2×11.5 130 15.99 ≤3 80%pass 199 138 2800 10000 18002 8962 7520 219**
19 Φ4.2×11.5 130 16 ≤3 80%pass 199 138 2800   17259 4960 5600 220**
20 Φ4.2×12.5 85 16 ≤25 90% 210 151 3150   18400 4960 8640 251**
21 Φ4.2×12.5 145 16 ≤3 80% 210 151 3150   18400 4960 8640 242**
22 Φ4.2×13 75 15.6 ≤25 90% 209 157 3150   174450 4880 8000 255**
23 Φ4.2×13 150 15.6 ≤3 80% 209 157 3150   17445 4880 8000 256**
24 Φ4.2×13.5 80-85 15.8 ≤25 90% 230 164 3550   17744 6700 6010 256**
25 Φ4.2×14 95 15.6 ≤25 90% 252 169 3550   19055 20490 23200 220**
26 Φ4.2×14.5 95 15.8 ≤25 80% 250 178 4000   5050 6700 11054 278**
27 Φ4.6×14 95-110 15   285 185 4200 6000 23200 11054 6370 310**
Company Profile

Environment-Friendly 2500t/D Dry Process Cement Ball Mill

Our Advantages

Environment-Friendly 2500t/D Dry Process Cement Ball Mill
 

Certifications

Environment-Friendly 2500t/D Dry Process Cement Ball MillEnvironment-Friendly 2500t/D Dry Process Cement Ball MillEnvironment-Friendly 2500t/D Dry Process Cement Ball Mill

After Sales Service

LUOYANG ZHONGTAI INDUSTRIES able to provide:
1. ENGINEERED SPARES - DESIGN AND MANUFACTURING
2. LARGE VOLUME STEEL AND IRON CASTING FOUNDARIES
3. HUGE MACHINE SHOP CAPABILITIES
4. TRAINING PROGRAMMES
5. PREVENTATIVE MAINTENANCE PROGRAMS
6. PREVETATIVE MAINTENANCE SERVICES
7. COMPREHENSIVE MAINTENANCE PROGRAMS
LUOYANG ZHONGTAI INDUSTRIES's Field Service Engineers are trained specifically in the LUOYANG ZHONGTAI INDUSTRIES brand group products but are capable of undertaking the servicing of other OEM brands.
Our technicians are equipped with the most advanced technological diagnostic equipment available to trouble shoot your equipment to optimise performance and minimise down time.
LUOYANG ZHONGTAI INDUSTRIES also has an extensive capability in supplying all you consumable and electrical/ mechanical spare part needs.
 

FAQ

Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
     2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
     3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time:
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms:
A: Accept payment type: T/T, L/C, Western union,Cash.
30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: We can supply technical guide for machines running test and parts maintenance if end user needs.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier